Name : John Edward Nugent       Nationality : British       Born : April.1956                 

 

Home Address : Whitby, England       Email: john@grangefarm.net

Experience and Capabilities

Providing Expediting Services on a global basis , supplier of wellhead development forgings .
Resident Company Representative involved from a QC perspective in the production and testing of Sub Sea and Top side valves of various sizes and up to class 5000.
Working to international standards including API and ASME.
Experienced in all stages of valve manufacture, including Castings, Forging and heat treatment, machining, Inconel weld overlay and the qualification of overlay welding procedures, mechanical testing and valve assembly.
Hydrostatic and Gas testing of new valves, including gate, globe, check and ball type with various seat designs.

QC on both Submarine and Overland Pipelines.

Welding of Super Duplex material for the construction of Umbilical assemblies, which also includes the testing of the completed Electrical and Hydraulic Dynamic Umbilical.

Single Buoy Mooring Systems, Catenery Anchor Leg Mooring systems 

Experienced in NDT methods including Ultrasonic, Radiography, MPI & Dye Penetrante, Product Analysis and Positive material Identification.

Familiar with Lay barge , Offshore Hook Ups, site operations , Pipe mill and Vendor Inspection. 

Conversant with codes and procedures used in the Oil and gas industry both onshore and offshore, work experience gained in Middles East, Europe and The United States of America..
Supervision of Engineering inspectors and NDT technicians, interpretation and implementing of
mandatory codes, standards and specifications, interpretation/sentencing of Radiographs,
Review / approval of certification, Inspection and Test Plans, Quality plans, and final acceptance of data packages.
Auditing and expediting on behalf of client. 
Dealing with site queries concerning modification to design requirements.
Day to day running of site office dealing directly with clients.

Familiar with Microsoft office.

To contact me simply click on my email address at the top of this page.

Qualifications : 

CSWIP 3.2 Senior Welding Inspector ref. SW02289
ASNT Level II RT. UT. MT. (company qualifications)

Courses :

Quality management systems training including examination leading to qualification as Lead Auditor, for BS EN ISO 9001~2000 in process of conducting audits as per requirements of the Institute of Quality Assurance. 

Memberships :

Member of the Institute of Quality  Assurance

Career To Date :

February 2006 to Present 
Expeditor Module Inspection Services Ltd. (MIS Ltd)

Based in Northern Italy, Expediting Orders for Aker Kværner Sub-sea.
Scope of work involves monitoring the production of forgings required to fulfil orders for Kværner global operations.
Dealing with procurement departments Norway, Brazil, USA, UK Singapore.

April 2005 August 2005/
Senior Pipeline Inspector SEPIL Corrib Gas Project.

SPI for Shell on the 20” Corrib Gas land line. Land fall near Bellmullet Co Mayo Republic of Ireland.
Duties included reviewing NDT and Welding Procedures, monitoring contractor in all aspects of pipeline construction and reporting .
Vetting Inspection and welding personnel.
Responsible for final acceptance of Radiographs and NDT reports.

April 2003-Dec 2004.
J.Ray Mcdermott Dubai Resident Company Representative.

Company Representative based in Colico, Italy for J Ray Mcdermott on the Ras Gas offshore expansion project.
Duties include visiting vendors employed in the production of valves varying in size from 2.1/16" to 38" 5000#
Involved in the initial forging, internal overlay of components with Inconel 625, machining and the final testing of valves.
Resident Company Representative at Acciaieria Fonderia Cividale, at Cividale Del Friuli Italy involved in the casting of 28” class 5000 valve bodies, this involved monitoring all heat treatment, mechanical testing, excavation and repair of defects, weld repair procedure qualification, and inspection of repaired areas for final acceptance.
Resident Inspector at the Dresser Grove Facility at Vogehera Italy. NDT , Assembly , Testing of 1” 2500 class Inconel 825 Ball valves, and 9” 5000 class forged body and closure ball valves.
Witnessed NDT testing on tungsten carbide coated components , Ball and Metal Seats.
Forged bodies and closures overlaid with Inconel 625 had PMI carried out to determine Fe content, overlay thickness checked, finally NDT on components by DP testing, assembly then Factory Acceptance Test to an approved procedure.

January 2002 - April 2003
ALLSEAS Marine Contractors, QC. Department Site Representative.

Allseas Site Rep at various sites connected to the Corrib project, looking after the manufacture and testing programme for the onshore and prototype offshore umbilical for the Enterprise Oil and Bord Gas Erieann Corrib Project, at Nexans Hallden Norway.
Visited contractors in Germany to carry out welding procedures then on to Italy for the manufacture and testing of two 20" fully welded 345 bar ball valves, following the valve manufacture from the forging of the components, machining, Inconel 625 overlay to the Factories Acceptance Test.

August 2001 to October 2001
Seaways Heavy Lifting Site Representative.

Representing SHL at the Erndtebrück Eisenwerk facility Germany, for the fabrication of ten 29 meter piles with anchor pad eyes for the extension of Monaco harbour.
Main welding process used was Submerged arc for the welding of the longitudinal and circumferential seams for the cans, which made up the piles, the pad eyes were welded using manual Flux core.
Dealing with contractor and client, ensuring all documentation in place for final acceptance.

February 2000 to February 2001
ALLSEAS MARINE CONTRACTORS, Q.C. Department Site Representative

Coordinating a number of projects in Holland and the USA.
Site Rep for the latter stages of fabrication of the Lorelay Cross Over and Stinger Extension.
Statoil Heidrun Gas Export Project P.L.E.M and associated pipework .
Winterschall A6-A to FB Pipeline Project .
Exxon Mica & Marshall Madison projects Site Representative for pipe in pipe, and P.L.E.M fabrication.
Based at the Bredero Price Facility Harvey LA. U.S.A.

April 1999 July 1999
ALLSEAS MARINE CONTRACTORS , Site Representative

Based at Prince of Wales dock Dundee Scotland, representing the company during the fabrication of 24" 14"& 6" 
Piggy back risers for the Eldfisk Water injection and Ekofisk II fuel gas pipeline project.
Duties involved the inward inspection of free issue materials including Taper Lok Flanges, ensuring their preservation prior to installation .
Welding Procedure Qualifications including Mechanical testing. Radiographic interpretation. 
Liaison between main contractor SCS their sub contractor R&M Engineering and Phillips Petroleum, Norway.

May 1998 Sep 1998
ALLSEAS MARINE CONTRACTORS, Site Representative

Based at Logstor Ror, Logstor Denmark. Monitoring production of pipe in pipe insulation work for the Amerada Hess / Stolt Comex Seaway Triton project.
Scope of work involved placing a 12" line pipe inside an 18" carrier pipe then injecting foam insulation between the carrier pipe and the line pipe.
A backing strip was then welded inside the carrier pipe to allow a half shell to be fitted during pipelay operations.
Involved in initial welding procedure qualifications, welder qualifications, foaming qualifications.
Answering site queries as they arose and generally dealing with all matters concerning the project.

March 1996 - May 1998
Did not work during this period due to an industrial accident.

April 1995 - March 1996
BLUEWATER ENGINEERING, Site Representative

Part of the Project Management Team, specifically dedicated to QC on all aspects of construction of a Catenary Anchor Leg Rigid Arm Mooring (CALRAM). A Rotary Tanker facility, under construction for BHP Petroleum, formally Hamilton oil.
Monitoring activities relating to the installation and testing of the Electrical and Instrumentation requirements. 
Fabrication carried out at the Brown and Root Highland Fabricators Yard, Nigg Bay, Scotland.
Also involved in QA audits at various vendors and the day to day running of a busy site office.

September 1994 - April 1995
TLU2 HSM SCHIEDAM HOLLAND, QC Inspector
Duties involved monitoring construction of TLU 2 Mooring Buoy ,client BP Columbia, on behalf of the project design company, Bluewater Engineering.
This involved the monitoring of all activities during fabrication, including the testing of the umbilical according to the Inspection and Test Plan.
Dealing with design queries as they arose, either answering site queries myself or in conjunction with design team.
Visits to various sites as expediter.

March 1994 - September 1994
ALLSEAS MARINE CONTRACTORS, QC Inspector

Responsible for all aspects of inspection, and final product acceptance, on board PLMV Lorelay, fabricating the pipe spool for the ST1 Lassmo Markam Platform Sub Sea connection.
Preparation of all documentation regarding this pipework for final acceptance by Lloyds.
Running welder qualification tests and weld procedures using the permanent arc monitoring system.
Responsible for QC on the fabrication of two 24" Pig Launchers and Receivers
Carried out dimensional surveys at various locations in Holland.

July 1993 - October 1993
VERLOME BOTLEK SHIP DRY DOCK

During this period I was employed as QC co-ordinator, ensuring the adherence of several contract companies to their own quality plans and to that of Verlome.
The Sedco Forex Sedneth 701 has been in the dry dock for the purpose of extending the existing living/ messing facilities, installation of a third mud pump, four new mud pits, new crane pedestal and cone and two new life boat platforms. The scope of work also included numerous pipe work projects both high pressure and low pressure and a survey of all connections of the platform structure.
Inspections were carried out on all the above, at various stages and prior to final inspection by Clients Rep and American Bureau of Shipping Surveyor.

ATKINS INSPECTION SERVICES LTD
Welding Inspector. Seconded to Shell on board PLMV Lorelay. 
Installation of two 16"Dia. 3.5. Km pipelines and PLEMS for Shell Draugen project.

June 1993
VAN DER CAMMEN BV ROTTERDAM

QC co-ordinator for contractor double jointing 3" pipe for Elf Petroland.
Dealing with welding sub contractor initial testing of welders. Review and monitor compliance with approved quality plan. Radiographic interpretation, ensuring all NDT requirements are met and correlating reports.
Overall supervision of all aspects of fabrication and documentation relating to final acceptance by client.

March 1993 - May 1993
ATKINS INSPECTION SERVICES LTD

Seconded to Shell on the Nelson project. Based on the LB 200 pipe laying barge as a Welding Inspector. 
Working to BS 4515 laying 10" & 20" pipe, using the Saturn BT automatic welding system, MMAW, and The Inner Shield welding techniques.

January 1992 - December 1992
BIB INCON NEDERLAND

Welding Inspector on various projects throughout Holland.

May 1991 - November 1991
ROXBY ENGINEERING LTD

Seconded to Shell Chemicals UK as part of the Project Management Team on section 1 of the North West Ethylene Pipeline Project. Duties involved approval of contractors procedures, Co-ordinating 28 inspectors, correlating their reports maintenance of bar charts and presentation of as built package. Radiographic Interpretation. QA Audits on various sub contractors and deputising for the Senior Pipeline Inspector as required.

March 1991 - May 1991
INSPECTORATE OIS

Radiographic Interpretation on DLB 1601 working on ELF Portland 36" Nougat Pipeline Project.

May 1990 - November 1990
MACTECH INSPECTION LTD (EUROPE)

Various Projects throughout Europe both onshore and offshore. Stena Apache pipe laying. Shell Pernis Refinery shut down work (Mechanical Inspection.) Mannersman Mulheim Pipemill Inspection. Offshore Hook Ups Mobil P12. NDT and Welding Inspection.

September 1981 - March 1990
SOLUS EMIRATES OFFSORE ABU DHABI

Seconded to ADMA OPCO as welding inspector on a jack up mobile work barge working in the Zacum and Um Shaif offshore areas. In eight years working for ADMA OPCO was involved with major shut downs, Well head hook ups,
Steel fabrications, testing of welders, Hydrostatic testing of pipework, monitoring heat treatment and final acceptance of pipework for service.

March 1976 - December 1980
NDT Technician on various projects in UK Gulf states and Iran Gach Seran Atkins Inspection

Employer References are available on request. 